CEG Lift Station Rehabilitation Project, Package #2

Owner: Citizens Energy Group

Engineer: GRW

Date Completed: April, 2017

Contract Amount: $2,613,776.89

 

Job description: This job was for six lift stations. Work applicable to all locations includes the demolition of the dry pit, construction of a new valve vault and meter vault (if required), new force main, new sanitary sewer, and related site and electrical work. Specific rehabilitation requirements for each station. Work includes reconstruction of the existing wet well, construction of a new valve vault, and replacement of the concrete pad and gravel access drive.