Winchester Sludge Drying Beds & Generator Replacement

Owner: City of Winchester

Engineer: HWC Engineers

Contract Amount: $1,275,205.47

 

Job description: Installation of 4 additional drying beds, valve replacement of the six existing drying beds, replacement of generator and transfer switch. MCC replacement