CEG Merrimac LS Improvements

Owner: Citizens Energy Group

Engineer: HNTB

Contract Amount: $357,850.00

 

Job description: This recommended construction includes the re-use of the existing wet well and the basic replacement and coating of all interior discharge piping inside the wet well, with the addition of a new larger valve vault structure, piping, valves, and hatch. Additionally, new pumps would be installed that would maximize the use of the existing electrical starter panel.